Friday, April 16, 2010
Construction Impacts Just Ahead
King County
Snohomish County
Whatcom/Skagit/Island Counties
Pierce County
For construction in the Tacoma Area, go here.
For additional information on roads in other counties, please visit here.
Construction for Thurston, and Kitsap Counties.
Monday, April 12, 2010
How did Pierce County fair in the state transportation budget?
The note worthy additions for Pierce County include:
- Funding for a new signal light at SR 702 and Mountain Highway
- Intersection improvements at Thorne Lane and Perimeter Road
- ARRA funds for high speed rail
Most columns in this summary of funded project in Pierce County represent an updated expenditure plan, not an actual appropriation.
Ramps to link SR 509 to Foss Peninsula
The cost of the project is estimated to be $19 million. Construction could begin in late 2010 if all identified funds are secured.
Pierce County HOV lane construction planned through 2022
A series of HOV lane projects are planned for Pierce County through 2022. WSDOT’s Tacoma/Pierce County HOV Program builds 70 high-occupancy-vehicle (HOV) lane miles in seven separate construction projects that will help move traffic into and through Pierce County.Currently, two projects are under construction
- Westbound Nalley Valley on SR 16
- Extension of HOV lanes on I-5 from the King/Pierce County line to Port of Tacoma Road
Future projects include:
- Eastbound Nalley Valley on SR 16
- Northbound I-5 Port of Tacoma Road to Portland Ave.
- Southbound I-5 Port of Tacoma Road to Portland Ave.
- I-5 Portland Ave. to M Street
- I-5/ SR 16 HOV Connectors
More information on each project is available in a recent presentation to RAMP and on the WSDOT website.
Thursday, April 08, 2010
Recovery Depends on Freight Infrastructure
The Washington State Freight Priorities folio defines how important Washington State's freight infrastructure is to the state economy; shows samples of statewide freight dependent businesses and how Washington’s distribution system is essential to local communities; and highlights priority statewide freight deficiency improvements and how they impact Washington manufacturers and farmers who rely on the transportation network to ship their products.
For more information on this document, or if you have questions, please contact freight@wsdot.wa.gov
Monday, March 29, 2010
Air Cargo Compliance Deadline Nears
The meeting is on April 7th 9:00 A.M. - 12:30 P.M. at the Hilton Seattle Airport & Conference Center, 17620 International Boulevard, Seattle, WA 98188. Anyone is interested in attending,can register here.
Remember, on August 1st, if cargo is not screened, it will not be transported by passenger aircraft!
If you interested in participating in the CCSP, but cannot attend the Seattle session, they are encouraged to contact Lon Siro, Regional Coordinator, Transportation Security Administration, 503-889-3074.
Tuesday, March 23, 2010
Transportation 2040 goes for a vote
Over time this growth will significantly impact demand on our region’s highways and transit systems. Transportation 2040 attempts to strategically plan for future transportation investments based on the anticipated demand, while considering environmental impacts, monitoring and how to pay for the capital and on-going costs of infrastructure.
Historically, stakeholders in Pierce County have been particularly concerned with insuring equitable geographic distribution of transportation dollars and strategic roadway and transit investments that aid the growth of economic opportunities in Pierce County. These stakeholders (all active RAMP participants) include Tacoma-Pierce County Chamber, Pierce County, Port of Tacoma, City of Tacoma and the EDB have commented on the draft Transportation 2040 plan.
The comments of these stakeholders are diverse and illustrate some of the competing perspectives of how development patterns should be influenced to best grow the Pierce County economy in the coming decades. Correspondingly, some stakeholders diverge on how and where to fund transit investments. Given that much of Pierce County has relatively sprawling land uses, where transit investments are less efficient, stakeholders with more auto-oriented constituent groups are, not surprisingly, more concerned with making roadway investments than those who serve urban population centers.
Next Steps:
March 19th Release of Final Environmental Impact Statement
March 25th PSRC Executive Board Recommendation
May 20th PSRC General Assembly Action
Friday, March 12, 2010
Pierce County comments on draft Transportation 2040
Here are the comments on the draft Transportion 2040 plan from:
Tacoma-Pierce County Chamber
City of Tacoma
Pierce County
Economic Development Board of Pierce County
Wednesday, February 17, 2010
Road improvements in Frederickson to close 176th St. E
Once complete, the improvements will be a significant benefit to the community. However, in the meantime construction delays and road closures will be a major inconvenience to the traveling public. Residents and businesses should plan for the following road closures:
Late Summer 2010:
10-day road closure of 176th St E between 38th Ave E and 51st Ave E
Late Summer/Fall 2010:
4-week westbound lane closure of 176th St E between Waller Rd E and 36th Ave E
Spring/Summer 2011:
4-month road closure of 176th St E for new bridge construction

Pierce County is committed to completing the work as quickly and efficiently as possible. The County issued construction bonds to fund these projects simultaneously rather than spreading the work out over multiple years as separate projects, which would have created years of detours and delays rather than a few months of closures.
Residents and businesses should plan ahead for this construction as detour routes will add an average of 30 minutes to trips and upwards of an hour during peak commute time. This may be a good time to form a carpool, work a different shift, or telecommute. Avoiding the detour routes during the morning and afternoon rush will help save time and inconvenience.
For more information Read the project newsletter, visit the project website, or contact project manager, Ramiro Chavez, ramiro.chavez@co.pierce.wa.us, (253) 798-7041.
Tuesday, February 16, 2010
Air Cargo Compliance Deadline Nears
There are regional town hall meetings and monthly Webinars to provide information regarding the 100% cargo screening mandate (and the Certified Cargo Screening Program) and to answer questions from shippers and freight forwarders.
The Non-Sensitive Security Information (SSI) version of the TSA Air Cargo ScreeningTechnology List Version 2.0 has been posted online.
This list indicates the technologies that can be used by air carriers, indirect air carriers, independent cargo screening facilities, and shippers in the Certified Cargo Screening Program to screen for domestic and outbound (of the U.S.) air cargo.
The next free webinar of the series on Thursday, Feb. 25, at 1:00 p.m. EST, titled: “Is package integrity critical to your business?” features TSA’s Marc Rossi, Certified Cargo Screening (CCSP) Program Branch Chief and guest speaker Brad Elrod, Senior Manager of Global Logistics Security, Pfizer, Inc.
There will be a series of webinars occuring monthly through June. If you haven’t registered for one of the free webinars or road shows, please visit this site. The next TSA Town Hall in Seattle will be April 7-8, 2010. Visit here to register.
Information regarding CCSP is now directly available via the TSA website. To access TSA’s CCSP, use this address.
For further information, you may contact Lon Siro, Regional Coordinator (PCSA)- Pacific Northwest and North Central Plains, Certified Cargo Screening Program.
Sunday, January 24, 2010
CV Pass System Developed
The Washington State Department of Transportation (WSDOT) has developed a new Commercial Vehicle (CV) Pass System intended to support freight movement by authorizing emergency, essential, and other goods delivery through affected areas during a highway disruption of two to seven days.
When will this system be used?
The state will activate the Commercial Vehicle Pass System when major freight highways are closed or severely restricted, and a limited- capacity detour is available nearby. CV passes will be issued on-line based on the highway detour’s capacity and the priority of goods carried, as determined by the State Emergency Management Division.
Where can I get more information?
More details about the CV Pass System, including the priority categories and the on-line application for a CV pass is available here.
Two test periods will be held, allowing shippers and trucking companies to become familiar with the on-line CV pass Web site. This is an opportunity to pre- register your company and identification number (truck license plate number), which could save you time during a transportation disruption.
The dates are:
January 25 – 29, 2010
February 22 – 26, 2010
Questions and comments about the new CV Pass System can be e-mailed to Jim Wright, WSDOT Permits Program Manager, at or by calling 360-704-6345 during regular business hours.
Friday, January 22, 2010
Draft T2040 Up for Comments
The PSRC’s Transportation Policy Board has been guiding the development of the plan for the past three years. The new transportation plan addresses critical issues such as congestion and mobility, the environment, and transportation finance. It is a framework document that guides future regional decisions, presents the region’s vision to federal and state policymakers and paves the way for the implementation of key regional projects and programs for the next 30 years.
PSRC will provide a paper copy upon request. Written comments on the draft plan are encouraged, and may be submitted using the online comment form. Written comments are also accepted by fax, mail or email.
Fax: 206-464-4825 (Attn: Transportation 2040)
Mail:
Puget Sound Regional Council
ATTN: Transportation 2040
1011 Western Ave, Suite 500
Seattle, WA 98104
Email: transportation2040@psrc.org
PSRC would appreciate receiving written comments as early as possible. Comments received by March 9 will be summarized for consideration at the March 11, 2010 Transportation Policy Board meeting.
Public involvement remains a vital component of the process. During the coming weeks, PSRC staff will continue to reach out to member jurisdictions, countywide subarea groups, and other technical and policy committees to gather final comments on the draft plan. These comments will assist the PSRC policy boards in developing the Final Plan in March. Adoption of the final Transportation 2040 plan by the PSRC General Assembly is planned for May 2010.
Sunday, January 17, 2010
Carrying the Load
Comments and feedback on the draft Regional Freight Strategy should be received by Friday, January 15 to ensure consideration in the final version that will be incorporated into the long range transportation plan, Transportation 2040, when it is adopted in spring of 2010. Contact person: Sean Ardussi, Senior Planner, Puget Sound Regional Council.
Thursday, January 07, 2010
Transport to the Airport
Transport to Seatac on a Sound Transit bus is ideal for business travel and a pleasant experience for those carrying few bags or small bags. Return travel is similarly easy, with buses leaving from Seatac (outside of baggage claim) at least twice an hour. Those traveling with especially large numbers of baggage should take note—there is no “underbus” storage, so large bags will be placed on seats.
For extensive details on Tacoma Dome to SeaTac bus travel, download the Green Business Travel between SeaTac Airport and Tacoma from Downtown: On the Go! document. The document covers in detail a round trip for business travel purposes. Feel free to distribute it broadly to fellow employees, friends, and family!
Questions? Contact Julia Petersen, Downtown: On the Go! (DOTG) Coordinator or check out the ST website.
Guest Author: Julia Petersen
Wednesday, January 06, 2010
Draft Freight Policy Up for Comments
If you are planning on attending the work session, please take some time to review the draft document available at this link prior to Friday’s meeting. There will be a limited number of full copies available for reference at the meeting.
Comments and feedback on the draft Regional Freight Strategy should be received by Friday, January 15 to ensure consideration in the final version that will be incorporated into the long range transportation plan, Transportation 2040, when it is adopted in spring of 2010. Contact person: Sean Ardussi, Senior Planner,
Puget Sound Regional Council.
Thursday, December 10, 2009
RAMP’s 2010 State Legislative Priorities
Key priorities include:
Protect project funding as scheduled
All projects funded within Pierce County via the 2003 Nickel package, the 2005 Transportation Partnership package and the 2009 Recovery and Reinvestment Act must be completed as originally scheduled. Priority projects include:
· I-5 HOV lanes- Construct the funded portion of the I-5 HOV system from the King/Pierce County line to SR 512 and SR 16 to I-5
· SR 167- Complete right-of-way procurement for the full width of the SR 167 corridor including HOV lanes
Extend SR 167
Continue the progress on the SR 167 mega project by developing a comprehensive approach to fund the extension of SR 167 from Puyallup to SR 509 in Tacoma, similar to the process pursued for the SR 520 bridge replacement program.
Fund the second phase of the SR 167 tolling study. Incorporate conclusions from the first phase of the SR 167 tolling study to identify funds to fill the funding gap for design and construction of the extension.
Extend I-5 HOV lanes
· Update project scoping for the extension of the I-5 HOV lanes mega project from S. 38th St. to SR 512
· Begin preliminary project scoping for the extension of I-5 HOV lanes from SR 512 to the Pierce/Thurston County line. The addition of HOV lanes through this section of the I-5 corridor will help mitigate congestion related to Joint Base Lewis-McChord.
Extend SR 167 HOT lanes
Begin preliminary scoping to extend HOV/HOT lanes to the current terminus of SR 167 in Puyallup.
Improve Local Revenue Sources
Strengthen and expand appropriate revenue sources to meet local transportation needs.
Support Flood Prevention
Contribute to Pierce County flood prevention plans and implementation efforts to protect primary freight and commute routes.
Wednesday, December 09, 2009
RAMP Signs Letter Supporting SAFETEA-LU Reauthorization
House Transportation and Infrastructure Committee Chairman Jim Oberstar (MN-08) and Ranking Member John Mica (FL-07), and Highways and Transit Subcommittee Chairman Peter DeFazio (OR-04) and Ranking Member John Duncan (TN-02) introduced legislation to reauthorize the federal highway, public transportation and safety programs, officially kicking off the congressional debate. While the 775 page bill is not perfect, it is a good start with a strong emphasis on reform and accountability.
The letter states:
The time to enact a robust, six-year federal surface transportation program authorization is NOW!
There is a big difference between public investment and public spending. And the American people know it. Unlike much government spending, strategic capital investments in our national highway, bridge and public transportation network provide long-lived assets that return value to American families, businesses and the U.S. economy for current and future generations—value far exceeding their initial cost.
Enactment of a multi-year transportation bill is a unique opportunity to address two major national economic challenges by promoting job creation and incentivizing capital investment. Strategic investments in transportation infrastructure can reduce productivity-robbing, energy wasting, emissions creating traffic congestion. They can also reduce health care costs by reducing motor vehicle crashes caused by inadequate road conditions.
Two, blue-ribbon, bipartisan commissions initiated by the Congress in 2005 have provided a consensus blueprint for action and financing. They call for policy principles we embrace: a surface transportation program that is performance-based, transparent and fully accountable to taxpayers, and user financed. And we heartily agree with their conclusion that sufficient revenue must be raised to fund new capital investments in highway and transit capacity to facilitate the movement of people and freight. These investments are absolutely critical to America’s future economic competitiveness.
We readily acknowledge the political challenges associated with financing the next surface transportation program authorization. But the obvious can no longer be ignored. To that end, we pledge to actively support user fee-based revenue solutions, including an increase in the federal motor fuels tax, necessary to fund a six-year investment bill that meets national transportation needs.
Let’s put America back to work and on the move!
Friday, December 04, 2009
RAMP Meeting Highlights Winter Flood Preparations

In response, Pierce County has established the Puyallup River Basin Executive Taskforce. The aim of the taskforce, comprised of a diverse group of stakeholders, is to develop a plan and a funding strategy to minimize the impacts flooding along the Puyallup River.
Similarly, WSDOT has developed solutions to two major flooding problems in Pierce County. In Sumner, along Traffice Ave. near by storm water pipes were retrofitted to more effectively drain roadway run off. Near SR. 161 the banks of the Mashel River were armored to prevent erosion and minimize flooding.
Thursday, December 03, 2009
Puget Sound Traffic Getting Better, but Worst in Nation, Studies Find
According to the Washington State Department of Transportation’s 2009 Annual Congestion Report (pdf, 1.7 mb ), in 2008 drivers in Washington state experienced (per capita) one hour less congestion compared to 2006. The report credits high gas prices, the economic downturn, and successful congestion fighting strategies with the decreases. While the news is good in the short-term, WSDOT predicts congestion will return as the economy improves. A summary of the findings is available on the WSDOT website.
Although congestion is down, that doesn’t mean commutes are good. A study by TomTom, a global positioning company found that Seattle has the worst traffic congestion of the 30 largest US cities, with 43 percent of the city’s roads having “heavy delays,” the Puget Sound Business Journal reports.. The company ranked cities as most to least congested according to how fast cars could travel on the street network. Traffic was defined as congested if drivers could travel at only 70 percent or less of the posted speed limit, and an average hour-long commute included 20 minutes or more of significant delays, according to TomTom.
Tuesday, November 24, 2009
Murray Morgan Bridge - Back to the City?
Originally named the 11th Street Bridge, in 1957 the 1,748 foot long steel-truss structure that connects downtown Tacoma to the Port of Tacoma was re-decked. The bridge and the corresponding E. 11th Street were designated as SR 509. At that time, ownership of the bridge was transferred from the City of Tacoma to the Washington State Department of Transportation.
Since that time the Murray Morgan Bridge has deteriorated and in 2007 WSDOT bridge engineers determined the bridge must close to all vehicular traffic, including emergency vehicles, to ensure public safety.
Advocates for the historic bridge argue that it is a landmark and should be rehabilitated. In response the City hired a consultant to develop a rehabilitation plan would allow the bridge to carry traffic. The consultant concluded that a comprehensive rehabilitation would cost approximately $80 million dollars. With just under $40 million for this project in the WSDOT budget, this leaves a $40 million shortfall that the City is trying to close.
To move forward with this plan the City has agreed to reassume responsibility for the bridge and its maintenance. According to the turnback agreement, the state would agree to provide the City with the available balance of the Puyallup Tribal Settlement Account, approximately $10.8 million and $26.2 million in federal funding, Federal Highway Administration (FHWA).
According to the Tacoma Daily Index, the final turnback agreement still needs to be approved by the full City Council.
The Tacoma Daily Index, “Tacoma closer to owning Murray Morgan Bridge.”
Wednesday, November 18, 2009
Building a Cross-Base Highway
Pierce County's long awaited and continually delayed Cross-Base Highway keeps looking for a solution to a need long overdue. For a project that started with a donation of right-of-way worth millions of dollars by Ft. Lewis, that head start in funding hasn't made much progress against other state-wide projects that keep bumping the Cross-Base Highway.As Fort Lewis is a work site that has gained 13,000 workers in the last demi-decade and seen a daily increase in thousands of vehicle trips, soldiers taking housing outside the post are continuing to seek housing in Thurston County as closer Pierce County housing is inaccessible via the congestion along the Pacific Ave.-SR 512-I-5 route, located in Parkland-Spanaway. Who hasn't noticed the increase in congestion on I-5 south of the post as soldiers commute back and forth to Thurston County?
But is our challenge so unique that we must create a solution, or is experience available elsewhere. Of course! We are not unique! Others have solved this problem!
Mayor John Cook, City of El Paso, TX and Charles H. "Chuck" Berry, El Paso District Engineer, Texas Department of Transportation, recently shared with nation-wide delegates at the Office of Economic Adjustment (OEA), Department of Defense , how El Paso responded to the transportation demands of military (job) growth.
El Paso and Texas built a 7.5 miles freeway across Fort Bliss and an airport. This was a $200 million construction project accomplished by a public-private partnership. El Paso and Texas cooperated with the private sector to build and finance this highway (pictured above). Using what they called "pass through tolls," the State of Texas pays to the private sector vendor a toll based on the number of cars that use the highway. For mutual protection, payments will not fall below $10 million nor rise above $12 million.
Today's state (and local) budget climate gives all parties an instant excuse for not spending $10 million in capital expenses each year. But alternatives do exist. For one example the Stimulus Bill, the American Recovery and Reinvestment Act, contains the Build America Bonds, which provides a federal subsidy to state and local bonds.
Others have taken notice. Mayor Efrain Valdez, Del Rio, TX, rose from the conference floor to endorse the Texas public-private partnership in road building and announce his city is doing the same thing.
Monday, November 09, 2009
PSRC Releases Opinion Poll on Regional Transportation
The survey concluded that Pierce County residents:
· Value maintaining/preserving current transportation system
· Addressing congestion is very important
· Safety is highly important
· More likely to support electronic tolling
More information on Transportation 2040 is available in a previous post: RAMP reviews PSRC's Transporation 2040
Pierce County Projects to be Included in T2040 Plan
The Pierce County projects to be included in the constrained portion of the plan can be viewed here. These projects include extending SR 167 to the Port of Tacoma, extending the SR 167 HOT lanes to the current terminus in Puyallup and building SR 704 the Cross-base Highway.
More information on the T2040 process is available in the previous post: RAMP reviews PSRC's Transporation 2040.
Sunday, November 08, 2009
WSDOT Survey Opens for Your Opinion
The Washington State Department of Transportation's mission is to keep people and business moving by operating and improving the state's transportation systems vital to the taxpayers and communities.They would like to know your opinion about how they're doing. Please take a few minutes to complete this brief survey. Your feedback will help them learn more about how they can improve their performance.
Friday, October 30, 2009
Congress Extends SAFETEA-LU
On Thursday, Congress passed legislation to extend SAFETEA-LU, and to continue
funding USDOT, through December 18th. The President should sign the bill into
law sometime in the next two days.
The Senate may attempt to pass a 6 month extension of SAFETEA-LU next week. The House Transportation Committee chair continues to oppose that.
For more information on
this and other related topics visit: http://wsdotfederalfunding.blogspot.com/
Friday, October 23, 2009
SAFTEA-LU Reauthorization Update
Reports are sketchy but apparently on Wednesday some Senators attempted, unsuccessfully, a legislative maneuver to pass an 18-month extension of SAFETEA-LU. “Hotlining” is a process in which Senators are asked if they would object to taking up a bill and passing it without debate or amendment. If so much as one Senator objects, the legislation must be scheduled for a floor debate and vote. It’s a process often used for non-controversial bills, and sometimes used to flush out potential objections and amendments.
At least one Senator objected, almost certainly Senator George Voinovich (R-Ohio), who supports a shorter extension (e.g., 12-month). Voinovich is retiring in November 2010, and may want the shorter extension so that he can influence the longer-term bill and funding for Ohio projects.
It’s possible the Senate could debate the bill next week (Oct 26-30). But there would likely be filibusters from Voinovich and others, and it’s unclear if the Senate could pass the bill next week. At any rate, it’s hard to see how a final extension bill could be negotiated by the House and Senate and sent to the President by November 1, unless there’s a last minute agreement on a shorter-term extension.
Best guess at this point is we get another one-month extension, along with a one-month extension of 2010 transportation appropriations spending.
Friday, October 16, 2009
WSDOT Takes Truck Ops Survey
The Washington State Department of Transportation is requesting your input regarding impediments to the operation of trucks in the State of Washington.The information gathered from this short survey will be used as part of the Highway System Plan.
The Truck Corridor Survey consists of (3) questions. Please take a moment to share your input with them. Click here to access the survey.
Tuesday, October 13, 2009
RAMP reviews PSRC's Transporation 2040
The presentation is available here.
PSRC staff is developing the preferred alternative based on public comments received on the DEIS this summer. The PSRC’s transportation policy Board comprised of elected officials and stakeholders from King, Pierce, Kitsap and Snohomish counties is scheduled to vote to recommend the preferred alternative to the PSRC Executive Board on November 12th. The Executive Board will adopt the preferred alternative on December 3rd.
For more information go to the PSRC’s project website
Lakewood Updates RAMP on OEA Congestion Study
The presentation is available here.
In January 2009, OEA awarded the City a $450,000 planning assistance grant to study congestion on Interstate 5 through Ft. Lewis. The grant funds efforts to refine computer traffic models and determine which transportation alternatives would best address the challenges in the Interstate 5 corridor adjacent to Ft. Lewis and McChord AFB.
The 18 month study, closely coordinated with the Washington State Department of Transportation, Ft. Lewis, McChord AFB and other regional stakeholders, considers which strategies hold the most promise for reducing the congestion drivers experience on I-5 as a result of the increased base population.
More information on the study is available on the City of Lakewood website and the WSDOT project page.
Thursday, October 08, 2009
Joint Transportation Committee Evaluates Alternative Funding Options
- The Evaluation Framework and alternatives being considered can be found here.
- A summary of the goals and process is available in a September 30th, 2009 presentation to the Joint Transportation Committee.
For more information please go to the Joint Transportation Committee’s website.
Thursday, October 01, 2009
Candidates Appear at Transportation Forum
Tacoma Mayoral/City Council Candidates’ Transportation and Land-Use Forum
On Thursday, October 1st, please join an exciting group of co-hosting organizations for a lively evening debate as we pose questions about transportation and land-use to the Tacoma City Council and Mayoral candidates.
When: Thursday, Oct 1st, 6:30-8:30 p.m.*
Where: Carwein Auditorium, Keystone Building - UWT
Event Co-Hosts:
Transportation Choices Coalition, The Tacoma-Pierce County Chamber, University of Washington Urban Studies Program, Futurewise, Cascade Bicycle Club, Tacoma Wheelman’s Bicycle Club, Tacoma Sun, Cascade Land Conservancy, Exit 133.
* Approximately two weeks after this event until election day, the Forum will be available for 24-hour viewing on Click! Cable TV’s local section of On Demand.
Thursday, September 24, 2009
Ramp Takes Leap
took shovels in hand for the official groundbreaking for the Lincoln Avenue Grade Separation. Photo: Kathy Tomandl, Port of Tacoma
Nowadays, no ONE builds transportation infrastructure. And last Friday's ceremony demonstrated the collaborative effort that results in success.
As the Port says on their website: Although local in nature, this project offers economic benefits for both Washington state and the nation. Tacoma is a gateway port, and much of the cargo moving through here is bound for inland markets such as Chicago and New York.
Upon completion, the grade separation will significantly improve rail and road efficiency and will also enhance air quality.
Monday, September 14, 2009
Most Popular Pavings - Good Intentions
Her presentation could be considered a lament. She recounted her first day of the job, when the Milwaukee bridge collapsed that lead directly to WSDOT's decision to close the Murray Morgan Bridge. Then, she recalled the first (of three) floodings of I-5 that lead to miles of truck-trailers queued with no alternative routes. And, she talked of a funding tie between cents per gallon and a declining gas sales/miles driven both because of consumer behavior changes and recessionary responses. And, let's not even get started on the state's ferries!
She did point to the $10 billion of projects just in the Puget Sound area, with another $5 billion in other parts of the state. Of 391 projects at the beginning, 183 are completed, 82 are under construction and 22 are about to go into construction. For anyone who wants to check up on their particular interest in a project(s), go to their website.
Q's from the audience covered a wide range of topics, but the most popular subject seemed to be SR-167. In response, Hammond noted that the corridor lost its funding proposal with the failure of Proposition 1. Now that transit has passed its expansion measure, the region is left without addressing its road future. The legislature has funded a tolling study for the completion of SR-167, to measure revenue potential and traffic diversions. SR-167 remains a hot topic, not because of the HOT Lanes tolling in the HOV lanes, but because of the new threat to flooding from failures in the Howard Hanson Dam.
All this and more makes one wish for debates of old when road surfaces were evaluated for quieter performance versus cost-effective permanency.
Thursday, September 03, 2009
Lincoln Ave. Overpass Breaks Ground- You're invited

Some people would call this a Groundbreaking, but we call it a Roadraising!
Friday, September 18, 2009
1:00 to 1:45 p.m.
Cookies and beverages served.
From Interstate 5 take the Portland Avenue exit(Northbound Exit #134 or Southbound Exit #135). At Portland Avenue, head north to Lincoln Avenue (0.7 miles).At the light, take a right onto Lincoln Avenue and proceedapproximately 0.4 miles to the parking area.
Please consider flat-soled shoes.
RSVP by email to apeterson@portoftacoma.com
Tuesday, September 01, 2009
A Call for Federal Transportation Reform
Based on these goals, the NTPP report contends that performance measures should be used to determine future federal funding allocation to state transportation agencies. While the report proposes that 67% of federal funding remain formula based, the other 33% would be competitively based on the performance of states’ transportation systems. As part of this performance determination, the group also calls for increased investment in Intelligent Transportation Systems, or systems embedded in transportation infrastructure that monitor the system and provide critical data to decision-makers and citizens.
The NTPP pitched their report to an audience of approximately 150 in the transportation field, including numerous state transportation heavy weights such as Paula Hammond, Secretary of the Washington State Department of Transportation and Charlie Howard, Transportation Planning Director for the Puget Sound Regional Council. Joni Earl, Sound Transit CEO, offered her eloquent and insightful thoughts on NTPP's recommendations during her keynote address, suggesting increased consideration of multimodal transportation in the NTPP's proposed goals and performance measures.
The NTPP’s report has been and will continue to be circulated on Capital Hill in the next 12 to 18 months of debate leading up to the next Federal Transportation Authorization Bill. While the current report is a finished product, NTPP representatives stressed throughout the forum that the conversation regarding federal transportation reform is ongoing and far from over.
Take a look at the NTPP's report here
Thursday, August 27, 2009
Pierce County Community Celebrates Cross Base

The ribbon cutting for Project 1 celebrates the completion of a project nearly 20-years in the making- the first phase of a planned six-mile, multi-lane highway stretching across the Fort Lewis and McChord military bases between SR7 and I-5. Project 1 widened a three-quarter mile stretch of Spanaway Loop to five lanes, added dual right-turn lanes from Spanaway Loop Road to southbound SR7 and dual left-turn lanes from northbound SR 7 to Spanaway Loop Road.
The remaining three Cross Base Highway projects will be completed as funding becomes available. Once completed, the new limited access highway will improve access for residents and freight in South Pierce County.
Friday, August 21, 2009
Crossbase Highway- Project 1 Complete!
When: 10 a.m., Wednesday, Aug. 26, 2009
Project 1 connects Spanaway Loop Road to SR 7, drastically improving safety and mobility. A new dual right-turn lane from Spanaway Loop Road to southbound SR 7 is already easing back-ups and improving safety during peak travel times.
The SR 704 Cross-base Highway is divided into five independent projects. Construction on Project 1, Spanaway Loop Rd to SR 7, began in July 2008. The four remaining projects are in the design phase. Go to http://www.wsdot.wa.gov/Projects/SR704/CrossBase/ for more information.
Directions to the event:
Wednesday, August 19, 2009
Pierce County’s HOV Lane Construction Begins!
From WSDOT News:
FIFE – If your Saturday night plans include traveling north on I-5 from Tacoma to Seattle, be ready for backups or, better yet, adjust your plans.
Crews on the I-5 HOV widening project through Fife begin closing lanes at 9 p.m. Saturday, Aug. 22. By 11 p.m., a triple-lane closure will be in place, leaving just the inside lane open to traffic.
There will be workers and equipment on the freeway, so please stay alert and drive cautiously through the work zone. Crews plan to begin reopening lanes by 8 a.m. Sunday, and have all four lanes open to traffic by 10 a.m. Sunday.
The lane closures allow crews to restripe a three-mile stretch of northbound I-5. The revised striping narrows each lane by a foot (from 12 feet to 11 feet) and shifts traffic away from the median to create work space for the widening project.
The I-5 Port of Tacoma Road to King County Line HOV project widens both directions of I-5 from four to five lanes from the Port of Tacoma Road to the King/Pierce county line. The two additional lanes extend the I-5 HOV network south from King County, three miles into Pierce County.
Construction, funded in part by the 2003 gas tax package, also includes more than $35 million in funding from the American Recovery and Reinvestment Act (ARRA).
Online project information: www.wsdot.wa.gov/projects/PiercecountyHOV/I5_PortTacomatoKing/
Contact: Rumina Suafoa, WSDOT Project Engineer, 253-534-3100
Jamie Swift, WSDOT Communications, 360-507-4261
Tuesday, August 18, 2009
Pierce County's Transportation Plan Update Delayed
Thursday, August 13, 2009
2010 Federal Transportation Appropriations
Highway programs would receive a 1% increase, transit funding would increase 3.3%, safety program funding would increase 1.3%, and aviation funding would increase 3.3 %. High Speed rail funding is penciled in at $4 billion, an increase over the President’s request of $1 billion. However, until Congress replenishes the Highway Trust fund, those spending levels cannot be achieved.
Tuesday, August 04, 2009
State and Federal Legislators and Staff to Discuss Puget Sound Transportation
In May, a local panel of experts identified the primary regional transportation challenges. In June, they discussed a few exciting opportunities to address those challenges. In August, they're pulling out all the stops, with Town Hall Part III - Perspectives from the State and Federal Level
Join the all-star panel of legislators and policy staff for a discussion on what it will take at the federal and state level to address our transportation challenges. Get an insight into their vision for the region's transportation future and find out what their plans are to make it happen.
Join us for a special discussion with our panelists:
Senator Mary Margaret Haugen, 10th Legislative District, Chair of the Washington State Senate Transportation CommitteeRepresentative
Representative Judy Clibborn, 41st Legislative District, Chair of the Washington State House Transportation Committee
Sheila Babb, Deputy State Director, Office of U.S. Senator Patty Murray
Jennifer Ziegler, Executive Policy Advisor on Transportation, Office of Governor Christine Gregoire
WHEN: Friday August 7, 12:00pm - 1:30pm
WHERE: Bertha Knight Landes Room, Seattle City Hall, 5th Avenue between Cherry and James St. (please note change in venue)
As always, feel free to bring your lunch.
This townhall series is brought to you byTransportation Choices Coalition, Futurewise, WashPIRG, Sierra Club Cascade Chapter, Bicycle Alliance of Washington, Cascade Bicycle Club, Seattle Transit Blog, Feet First, Commute Seattle and Zipcar
Wednesday, July 29, 2009
Funding the Fast Track
At issue was Cong. James Oberstar, Chairman of the Transportation and Infrastructure Committee, who wished a six-year authorization for $500 billion when Congress returns in the fall. To that end, he had proposed an interim $3 billion.
The Administration said $7 billion is needed to keep paying states through fiscal (September) 2009, and an additional $20 billion through an 18-month extension.
As Washington State knows about its similarly sourced motor fuels tax on gallonage, the fund has fallen as motorists drive less because of higher prices. The allocation will come from the feds’ general fund.
Tuesday, July 14, 2009
The journey begins: Link light rail opens for service this Saturday
Link light rail opens for passenger service between downtown Seattle and Tukwila on Saturday, July 18, with free rides all weekend before moving to regular paid service on Monday. Here’s what riders can expect during opening weekend.
Inaugural ribbon cuttingThe Link inaugural ribbon cutting happens on the plaza at Mt. Baker Station on Saturday morning at 8:20 a.m. Immediately prior to the ceremony, news media are invited to join the mayors of Seattle and Tukwila on the station platform as their trains arrive carrying representatives from their respective cities.
After the ceremony, ticket-holders for the two inaugural trains (one northbound and one southbound) will move to the platform and board the trains. The majority of inaugural ride ticket holders are members of the public who received tickets through radio giveaways and other promotions.
Schedule, service levels opening weekend
The free opening weekend light rail service will operate with special hours:
Saturday - 10 a.m. – 8 p.m.
Sunday – 10 a.m. – 6 p.m.
Trains will depart each station about every 7-1/2 minutes throughout the day. Sound Transit has made provisions for a high volume of riders on the opening weekend; lines are expected. The number of riders picked up at each station will be limited to a predetermined number to preserve capacity for passengers to board at other stations. Each launch weekend train will carry about 350 riders, including standees.All riders must deboard upon reaching one of the line’s termini (Westlake for northbound trains and Tukwila for southbound trains). Upon reaching a terminus, riders can wait in line again to return via light rail, or choose the potentially quicker option of bypassing the light rail line and returning via free shuttle buses. Special shuttle buses will run along the route opening weekend and stop at every station. All rides are ADA accessible.
What services will be available at stations?
Each station will feature a welcome portal staffed by Sound Transit to provide information about wait times and answer questions about opening weekend and regular service.
Portable restrooms will be provided at each station, along with family-friendly acoustic
entertainment at all stations. Food and beverages will be available for purchase from nearby local restaurants and stores. There will be a food vendor at Tukwila International Boulevard Station.PLEASE NOTE: Free connector buses from Tukwila to Sea-Tac International Airport will be available from July 20 through the opening of direct light rail service to the airport in December 2009. However, the connector buses will not be in service on the opening weekend.
Expect crowds
While Sound Transit is not making a specific prediction for the number of riders on the opening weekend, provisions are in place to manage a significant turnout. In addition to the start of Link service on July 18, about 60,000 fans expected to attend a noon Sounders FC soccer match at Qwest Field. The Bite of Seattle at the Seattle Center will also draw about 450,000 people over the weekend.
Getting to the stations
There is no parking at Link stations in Seattle, and parking at Tukwila will be extremely limited. Riders are encouraged to bus, walk or ride their bicycle to a station. Bicyclists are encouraged to leave their bikes at special staffed "bike corrals" that will be available on opening weekend. For a list of transit centers and bus routes that can connect you with downtown Seattle on July 18 and 19, visit http://www.soundtransit.org/Projects-and-Plans/Project-Updates/Traveling-Downtown-July18-19.xml. For more information about all Sound Transit services and help planning your entire trip, visit http://www.soundtransit.org/.
More information
For detailed maps and much more information on opening weekend and regular service see: www.soundtransit.org/linklaunch
Follow us on Twitter
For up-to-the-second information during opening weekend events follow Sound Transit on Twitter at Twitter@ST_TravelLight. We’ll tweet all day about which stations have the shortest lines, what’s happening at the stations and behind-the-scenes updates. Twitter updates will also be posted at www.soundtransit.org/linklaunch
CONTACT: Bruce Gray—(206) 398-5069 or bruce.gray@soundtransit.org
Geoff Patrick—(206) 398-5313 or geoff.patrick@soundtransit.org
Linda Robson—(206) 398-5149 or linda.robson@soundtransit.org
-- Sound Transit plans, builds and operates regional transit systems and services to improve mobility for Central Puget Sound. --
Wednesday, July 01, 2009
Sound Transit Parking Pricing Study
Starting this summer Sound Transit will engage in a 14-month analysis to identify, analyze, evaluate and recommend strategies to effectively manage increasing demand for parking at Sound Transit’s transit stations and park-and-ride facilities.The parking pricing study will focus on the feasibility and implications of instituting parking charges along the South Sounder Commuter Rail Line between Tacoma and Seattle, as well as how charging for parking would integrate into the Agency’s the region’s priorities for transit system use and access.
The stations and park and ride facilities that will be reviewed in the analysis include: Kent, Auburn, Sumner, Tacoma Dome and possibly South Tacoma and Lakewood.
Review the scope of work and timeline for the analysis here.
Fife Valley Avenue Construction
Review details of the project and the detour routes here. For more information about the project please visit the City of Fife’s website
Monday, June 29, 2009
Projects Approved by the Pierce County Regional Council
On June 18, the Pierce County Regional Council adopted recommendations from its Transportation Coordinating Committee (TCC) for allocating the $14,032,798 of Federal Transportation Funds allocated to Pierce County by the Puget Sound Regional Council (PSRC).
Listed below are the projects recommended for funding:
PRESERVATION PROJECTS
· TAC-36 Portland Ave from E. 38th St. to E. 56th St. $900,000
· SUM-30 East Valley Highway Resurfacing $200,000
· FIR-7 S 19th /Columbia St Grind & Overlay $570,900
· PC-21 Orville Road E - Orting Kapowsin Highway to BR #5175-C $520,164
ROADWAY PROJECTS
· TAC-38 Stadium Way $2,950,000
· SUM-31 Traffic Fryar Avenue & Main Street Intersection Improvements $2,118,593
· TAC-35 So Tacoma Way Corridor Multimodal Improvement Project $ 100,000
· FIF-6 70th Ave E R/W, 20th Street Intersection to 2900 Block $ 476,441
· LAK-13 Bridgeport Way - Steilacoom Blvd to 83rd St $ 750,000
TRANSIT PROJECTS
· PT-25 Shuttle Vehicle Replacement $1,837,613
NONMOTORIZED PROJECTS
· TAC-37 2011 Sidewalk Reconstruction Project $ 374,700
· TAC-39 Historic Water Ditch Trail $1,195,000
· LAK-12 100th St Gravelly Lake Dr to 59th Ave $ 867,000
· UP-40 Mildred/67th Avenue Improvements $ 472,387
OTHER PROJECTS
· PC-24 Transportation Options $ 700,000
TOTAL ALLOCATION $14,032,798
The above projects must still be approved by the Puget Sound Regional Council (PSRC). The PSRC’s Transportation Policy Board will review the list on July 9th. The Executive Board is scheduled to review the list on July 25th.
The TCC will next recommend a list of contingency projects for PCRC approval. The next meeting of the PCRC will be on July 16, 2009.
Tuesday, June 16, 2009
Balancing Trips and Housing
HUD reports that low-income families spend a disproportionate amount of their income on transportation-related expenses, as they often trade shorter commutes for the reduced housing costs found in outlying areas.Monday, June 15, 2009
Monday, June 08, 2009
SAFETEA-LU TWO
Congress approved and President Bush signed HR 3, the Safe, Accountable, Flexible, Efficient Transportation Equity Act: A Legacy for Users (SAFETEA-LU) on August 10, 2005.
SAFETEA-LU is a $286.5 billion highway and mass transit bill aimed at enhancing safety, economic productivity, economic growth, and reducing traffic congestion and pollution.
SAFETEA-LU will sunset on September 30, 2009, and Congress is beginning the arduous task of determining how to revitalize this important transportation funding measure in the next reauthorization cycle.
Recently, the American Association of State Highway Transportation Officials (AASHTO) and the American Public Transportation Association (APTA) released a study citing “bottom line” funding needs for U.S. Highways and mass transit systems at a whopping $240.5 billion dollars per year.
Congressman James Oberstar, chairman of the House Committee on Transportation Infrastructure, recently discussed a $450 billion dollar, six-year bill; however, it remains unclear how the other committees (namely Ways & Means) will decide to pay for that. To put it in perspective, let me remind you that the current authorization is $286.5 billion dollars over the five-year funding life of the program.
There is no question our nation’s transportation infrastructure is broken. We have not been investing enough money in roads, bridges and transit to maintain these systems, let alone build capacity. But increased funding is not the only answer. Long-term planning and investments in transportation must be a priority, but any proposed legislation must also provide reforms to ensure money is used for needed projects and not wasteful spending. It is critical that we provide significant revenues tied to fulfilling the federal responsibility in meeting the national interest and maintenance of a user-fee-based trust fund protected by budgetary firewalls.
As Congress looks toward reauthorization of funding from the Highway Trust Fund, the Americans for Transportation Mobility coalition, comprised of representatives from business, labor and transportation sectors have weighed in with some guiding principles for reform:
- Focus on National Needs – A strong federal role built on national needs stemming from interstate commerce, international trade policies, interstate passenger travel, emergency preparedness, national defense, and global competitiveness.
- Require Accountability – Project approval and funding must be linked to economic benefits and performance-based outcomes.
- Encourage Private Investment and Financing – The federal government should encourage project financing and delivery approaches that attract private investment within an appropriate federal framework.
- Eliminate Wasteful Spending – Limit earmarks that are not related to transportation infrastructure, if they do not address the goals of federal transportation policy, or they have limited or no national benefit.
Saturday, June 06, 2009
Cash for Clunkers
NASCAR may no longer have the fastest track. The House may vote as early as next Tuesday on a bill to provide a cash-for-clunkers trade-in proposal.The bill is expected to be considered under suspension of the rules, a fast-track procedure barring amendments and requiring a two-thirds vote for passage. This updated version of an earlier bill is an amendment to the climate change bill (HR 2454). A matching bill (S 1135) has been introduced in the Senate and may be added an amendment to a tobacco regulation bill (HR 1256).
Consumers would receive a voucher for up to $4,500 to purchase or lease a new, fuel-efficient vehicle (car, SUV or truck).
- Helping the auto industry and dealers
- Helping the Rust Belt
- Helping the nation's economy
- Getting cleaner air
- Getting better fuel economy in the nation's vehicle fleet
- Lessening dependence on imported oil
Friday, June 05, 2009
Bedding Down with BNSF
In this short video, BNSF shows you how it is taking advantage of track operating windows to update bridges, signals and track, and upgrade technology to further increase velocity. They report that more than half of their year's capital plan is focused on improving the railroad's infrastructure.Photo is NOT linked.
Thursday, May 28, 2009
Gregoire Vetos Transit Bill
On the TNT's Political Buzz blog Turner wrote:
Supporters of public transit are none too happy with Gov. Chris Gregoire after she decided earlier this month to veto a provision to make it easier for transit agencies to collect more taxes from the public.
That includes the sponsor of the transit-funding proposal, Rep. Geoff Simpson, D-Covington.
"Gregoire is such a major disappointment," Simpson said in an e-mail last week, right after the governor vetoed a portion of Senate Bill 5433. "While she is chauffered around in her black limo and on her private airplane, people who can't afford a car will be struggling to find a ride on a bus. No problem for her though. Sad."
The provision that Gregoire vetoed would have allowed transit boards to ask voters to raise their vehicle registration fees by as much as $20 a year to pay for bus service. The governor said local governments already have that authority. Besides, she added, she didn't want the Legislature to get ahead of itself. The budget provides money to conduct a study on alternative sources of transportation funding, she noted.
Transit advocates say those reasons are pretty lame.
Although it's true local governments can create transportation benefit districts and raise up to $100 per vehicle (with a public vote) those are for mostly for cities and counties, and the process is cumbersome.
"It is nearly useless for transit," Simpson said.
Andrew Austin, policy associate for Transportation Choices Coalition, said transit agencies are seeing their sales tax collections decline just as the demand for bus service is rising.
It's also ironic that Gregoire would issue an executive order to push ahead with policies aimed at reducing how much people drive -- vehicle miles traveled -- while cutting options for transit, he said.
"Reducing VMT per capital is going to be hard to do without more transit, and transit service is falling off a cliff because of decreasing funding," he said.
The thrust of SB 5433 was to give cities and counties more flexibility in how they use their existing sales and property taxes, basically letting them use the money to avoid laying off existing workers instead of having to hire brand-new workers.
Gregoire appears to be at leasts partially accommodating Sen. Mary Margaret Haugen, chairwoman of the Senate Transportation Committee. Haugen and Sen. Chris Marr, D-Spokane, both voted against the bill and later urged the governor to veto those parts. They cited the very reasons that Gregoire did in her veto.
The governor left intact a another transit provision, one that will let the King County Council raise as much as 7.5 cents per $1,000 in property values to provide as much as $30 million a year for Metro Transit. That tax increase could be done without a public vote.
This is the answer I got from Rep. Geoff Simpson, D-Covington, when I asked him whether the governor had vetoed just the $20-per-vehicle tax for transit or the property tax for King County Metro Transit, or both.
Simpson sponsored the language that would have made it easier for transit districts to raise money for bus service, with a public vote.
She vetoed just the $20 congestion reduction tax. She cited the TBD (transit benefit district) as a reason and a study of future transportation funding options as her reason. The $20 voter approved tax was the only hope to stem large cuts in service across the state. Because of the way the TBD statute is written, it is nearly useless for transit. Not only is the money not dedicated to transit in TBD, to enact it requires a huge degree of cooperation among counties and cities and little financial reward for that cooperation. It's why there are no TBDs in the state. The transportation funding study doesn't mention transit and was meant for roads only. Attached is her veto message.
Here is the governor's veto message.
Here is the letter in which Sens. Mary Margaret Haugen, D-Camano Island, and Chris Marr, D-Spokane, urge the governor to veto the transit provisions.
Here is the final bill report on Senate Bill 5433, which includes the effect of the governor's veto.
Friday, May 22, 2009
National Maritime Day May 22 Proclamation
Office of the Press Secretary
------------------------------------------------
For Immediate Release May 20, 2009
NATIONAL MARITIME DAY, 2009
- - - - - - -
BY THE PRESIDENT OF THE UNITED STATES OF AMERICA
A PROCLAMATION
Americans have long looked to the sea as a source of security and prosperity. Bounded by two oceans and the Gulf of Mexico, and criss-crossed by a myriad of inland waterways, America's destiny as a maritime nation was a story foretold.
The Merchant Marine took up arms alongside the Continental Navy to help defeat the British Navy during the American Revolution. Since then, they have served bravely as the United States has faced threats ranging from war to piracy, and our seafaring fleet has proven instrumental in protecting our safety. In times of conflict and crisis, the Armed Forces rely on the Merchant Marine's sealift capability to transport critical equipment and supplies. Time and again, mariners have demonstrated their willingness and ability to meet daunting challenges.
Waterways have also enabled much of the commerce that has expanded America's economy. Domestic and international commerce occurred along rivers and coasts even before our Nation's birth. Great cities have sprouted near waterways, and maritime activity remains crucial to our economy today.
The men and women of the U.S. Merchant Marine and the many other workers who have supported the maritime industry have made significant contributions to our leadership in the global marketplace, and to our security.
On this National Maritime Day, we also mark the opening of a permanent exhibition at the Smithsonian Institution, "On the Water." It demonstrates the importance of the maritime industry and chronicles our history as a maritime nation.
The Congress, by a joint resolution approved May 20, 1933, has designated May 22 of each year as "National Maritime Day" and has authorized and requested the President to issue annually a proclamation calling for its appropriate observance.
NOW, THEREFORE, I, BARACK OBAMA, President of the United States of America, do hereby proclaim May 22, 2009, as National Maritime Day. I call upon the people of the United States to mark this observance by honoring the service of merchant mariners and by displaying the flag of the United States at their homes and in their communities. I also request that all ships sailing under the American flag dress ship on that day.
IN WITNESS WHEREOF, I have hereunto set my hand this twentieth day of May, in the year of our Lord two thousand nine, and of the Independence of the United States of America the two hundred and thirty-third.
BARACK OBAMA
Thursday, May 14, 2009
Governor Signs Transportation Budget in Tacoma
FOR IMMEDIATE RELEASE
Thanks to a broad coalition of stakeholders, South Sound residents
and businesses stand to benefit from the historic state transportation budget signed Wednesday by Gov. Chris Gregoire.Pierce County Executive Pat McCarthy hosted a reception immediately after Wednesday’s bill-signing ceremony to thank the Gregoire administration, legislators, stakeholders and staff for their hard work that led to approval of a state transportation budget that’s expected to preserve and create tens of thousands of jobs.
“We’re honored that Governor Gregoire chose to sign this historic legislation here in Pierce County, where so much work is set to be done to improve the movement of people and freight,” McCarthy said during the event at the Greater Tacoma Convention and Trade Center. “The governor has demonstrated steady leadership and a willingness to tackle controversial and complex issues in a very challenging budget climate.”
Highlights of the transportation plan that pertain to Pierce County include:
-- Extending car-pool lanes on Interstate 5 to Tacoma. (read TNT article)
-- Widening or realigning portions of SR 161.
-- Purchasing property for the future expansion of SR 167.
-- Making safety improvements to SR 302 in the Purdy area.
-- Widening SR 410 in the Bonney Lake area.
-- Making other improvements to roads, bridges, railroad tracks and ferry facilities around the region.
Fore a complete list of Pierce county transportation projects click here.
Shortly after taking office, McCarthy quickly organized more than 100 representatives of local government, business, labor, Indian tribes and environmental groups to unite to make sure Pierce County maintained a level of state funding that is appropriate for Washington state’s second-largest county.
“This coalition of stakeholders made a huge difference,” McCarthy said. “They signed letters. They made phone calls. They spoke with one powerful voice. Legislators told us that this coalition was very effective.
“We can’t let up now. We must keep our momentum as we implement the stimulus programs, and we will do so in a fully transparent way,” she added. “With the help of the leaders who got us this far, I know we can get back on the road to prosperity and success.”
View the list of the transportation coalition members.
Contact: Hunter George, Pierce County communications director, 253-798-6606 or hgeorge@co.pierce.wa.us.
Find more Pierce County news at http://www.piercecountywa.org/ or follow us at twitter.com/pierceco.
Friday, May 08, 2009
2009 SAFETEA-LU Reauthorization Update
SAFETEA-LU, the Safe, Accountable, Flexible, Efficient, Transportation Equity Act- a Legacy for Users (SAFETEA-LU), directs surface transportation programs and policies for the federal government. The Act is scheduled to be renewed by Congress before September 30, 2009. However, Latasha Wortham from Congressman Dicks’ district office suggested that the Act would not be voted on by the full Congress until January 2010.
Wortham advised that projects likely to be at the top at legislators lists will include those projects related to:
· Climate Change, specifically reducing vehicle miles traveled
· Bridge safety projects
· Transit infrastructure and efficiency
· Freight mobility
· Highway safety
The Washington State Department of Transportation has a long list of statewide projects requesting federal funding. There are three Pierce County road projects on this list. (Pierce Transit has also made a SAFETEA-LU funding request.)
· SR 167, Tacoma to Puyallup New Freeway $160,000,000
· I-5, Nisqually to Thorne Lane, Congestion Relief and Safety Improvements $3,440,000
· SR 302 Corridor Safety Improvements $1,000,000
Friday, May 01, 2009
Washington’s first stimulus highway project breaks ground- in Ellensburg
The contract is expected to generate 25 jobs, between prime contractor Columbia Asphalt and its seven subcontractors, said state Transportation Department secretary Paula Hammond
Gov. Chris Gregoire, Hammond, state Rep. Judy Clibborn and others attended the kickoff of the repaving project, which is the first of 181 roads projects to be funded by the American Recovery and Reinvestment Act.
The Recovery Act requires states to make sure 50 percent of their stimulus money is committed within 120 days, and Washington has met that target two months ahead of time. That means Washington could be in line for additional money from other states that don’t meet that requirement, Hammond said.”
Pierce County will complete five projects with the stimulus funds
· SR 167 Rechannelization in Orting
· Shaw Road Extention phase III in Puyallup
· Lincoln Ave. grade separation near the Port of Tacoma
· Rural Town Center improvements in Eatonville
Additionally, WSDOT received $70 million from the stimulus to to construct HOV lanes from Port of Tacoma Road to the King County Line, supporting an estimated 350 jobs. Design work is currently under way. Construction is scheduled to start in the summer of 2009. The project is scheduled to be open to traffic in late 2011.
The remaining $7.8 million will be used to accelerate preliminary engineering on the I-5/SR 16 Eastbound Nalley Valley project, which is scheduled to go to construction in 2011.
